What Would a Data Centre Look Like in the Hawkesbury or Penrith? Is It Something Josephine or Joe Average Would Want?

Data Centre
A large data centre campus in Western Sydney, showing the scale of infrastructure needed to support cloud computing and AI services.

When most people think about artificial intelligence, they probably think about a chatbot, a search engine or an app on their phone.

It’s easy to forget that AI relies on physical infrastructure. Behind the screen are data centres filled with computer servers, cooling equipment, power systems and network connections.

These facilities aren’t new. They have been providing online banking, cloud storage, streaming services and business systems for years. What’s changing is the growing demand for computing power, particularly as AI becomes part of everyday life.

This makes the data centre as a local issue rather than a technology issue. There are already plans for some very big data centres in Western Sydney. The Mamre Road Data Centre Campus at Kemps Creek near Penrith is one of these.

The proposal is for six buildings (four storey), 936 cooling units and 852 diesel back-up generators, substantial fuel storage. These numbers indicate the amount of equipment required to support a large data centre, but the generators are for back-up power as opposed to normal use.

The proposed campus has a power capacity of 1 gigawatt (GW). That is a lot of electricity infrastructure, but it is not capacity for use. We’ll discuss this figure in more detail later in the article. [1]

So, what would a development of this nature look like for those who live around Penrith and the Hawkesbury?

What does 1 GW mean?


The 1 GW figure seems like a vast number, but it is important to understand what it represents.

The proposed power is rated up to 1 GW. This does not imply that the facility will be operating at 1 GW all the time.

If a 1 GW facility operated at that level for a whole year, the calculation would be:

1 GW × 8,760 hours = 8,760 GWh, or 8.76 TWh of electricity.

That is a theoretical maximum based on continuous full-capacity use, not a forecast of the Mamre Road facility’s actual electricity consumption.

To give the figure some context, if a facility averaged 500 MW over a year, it would consume 4.38 TWh. At an average of 750 MW, annual consumption would be 6.57 TWh.

These are examples to show the relationship between power and electricity use, rather than estimates of what Mamre Road will consume.

Ireland provides an interesting real-world comparison. Its Central Statistics Office reported that data centres used 7,663 GWh of electricity in 2025, accounting for 23 per cent of the country’s metered electricity consumption. Consumption increased by 10 per cent compared with the previous year. [2]

The figures cannot be directly compared as Australia has a much larger electricity system. Ireland, however, illustrates just how important the electricity demand of data centres can be when these are in a single area. Digital infrastructure is also becoming an increasing demand in Australia.

As part of the Australian Government’s consultation paper issued in September 2026, there is an increasing demand for land, energy, water and high-capacity telecommunications. It also reveals the reasons why data centres are located close to population centres; access to user base and network infrastructure can be relevant. [3]

Whether a proposed data centre is a 1 GW or not is just not the question for Western Sydney. This is the amount of electricity it will consume, if that can be supplied by the current electric network, and what more will be needed to meet the demand.

These questions also need to be considered alongside Australia’s wider electricity planning. The research CSIRO is doing into the cost of different generation and storage technologies is known as GenCost and offers some context for decisions relating to future energy infrastructure. [11]

If there was a reliable estimate of the average electricity use for a particular project that would help to answer those questions. If there was no maximum capacity, it would be incorrect to assume it as daily consumption.

Why is AI making this bigger?

Why is AI making this bigger?
Rows of servers inside a data centre. These systems support everything from online banking to cloud storage and artificial intelligence.

Data centres have been around for a long time, before even ChatGPT!

The change is in the increased demands for computing power especially when AI enters the mainstream of daily life.

To train and run large AI models, powerful processors are necessary. These do utilize electricity and create heat, and more computing equipment will therefore need more cooling and support infrastructure.

That is why the electricity system is now part of the discussion. Researchers are now exploring how some of these AI workloads can be moved to other time or place when the electricity network is pressurised.

An Australian pilot to explore this is underway by CSIRO and the University of Queensland. The technology firm has modelled some workloads that could be adjusted by as much as 20-50 per cent, although the results are yet being independently assessed. [4]

If successful, this could help to cut down electricity use at data centres during peak times without affecting critical services.

Although it is still a developing method, however. But it is too early to suggest that such a shift is even possible or that if a facility is able to reduce its electricity use by 20–50 per cent by changing some workloads to be more flexible, the same percentage of electricity could be saved.

Why is AI making this bigger?

What about water?
Cooling equipment helps prevent servers from overheating, but its energy use, water requirements and noise levels depend on the system installed.

Water use is another issue where the details matter.

Data centres generate considerable heat, so they need cooling systems to keep their equipment operating safely. Some cooling systems use water, while others rely more heavily on air cooling. The amount of water required depends on the technology, the size of the facility and local weather conditions. This means there is no single water-consumption number that can applied to all data centres.

One of the interesting examples from Australia is the proposed Western Downs Digital Infrastructure project in Queensland. According to ABC News reporting, the project would require approximately 522 kilolitres of water per day during construction. Normal water consumption is estimated
to be about 16.5 kilolitres per day, once the installation is in operation, and the developer is considering using recycled wastewater and rainwater harvested for the purposes of water supply. [5]

That’s a considerable difference between construction and everyday use. However, these are estimates for a proposed development, not measurements from an operating facility.

Unlike Mamre Road, the proposed size and design of the Western Downs proposal differs, so the water figures should not be used to predict water consumption in Western Sydney.

The key issues for those living around Penrith or the Hawkesbury are how much water a proposed facility will require, and how that water would be sourced, and whether demand would spike when the weather is hot.

The effects of drought and the additional water infrastructure would also have to be considered, as would the use of recycled water. An intensive drinking water facility may have other concerns than a facility that uses recycled water or water with reduced consumption.

So, the details of each proposed data centre’s cooling system and water management plan are far more important than the average across the industry. Clear projections of the development’s use of water and the ways these demands would be met should be available before residents make decisions on whether a development is appropriate for the area.

How many jobs would there actually be?

Building a data centre is usually seen as offering one of the greatest advantages – employment. However, the headline figures are not always accurate.

The site may be occupied for several years by electricians, builders, engineers, project managers and specialist contractors. When the building is completed, however, the manpower requirements for running the operation can be significantly reduced.

ABC News reports that while data centres can create employment opportunities, it’s possible to overestimate the benefits when the temporary nature of a construction role is not clearly differentiated from a permanent one. [6]

The proposed Western Downs Digital Infrastructure project in Queensland is an interesting comparison. The developer has cited approximately 1,500 construction jobs and 1,400 existing positions for the completed development. However, these are projections for an exceptionally large proposal, not verified employment outcomes. [7]

Research from the United States gives a clearer picture of what an individual operating facility might be like.

The Joint Legislative Audit and Review Commission of Virginia reviewed the economic effect of the data-centre industry in the Commonwealth in 2024. Around 50 full-time workers, about half of whom are contractors, could work in a typical 250,000-square- foot (23,200-square-metre) data centre, industry representatives told the commission. However, at the height of the construction, one building may have around 1,500 employees. [14]

The commission determined that much of the economic gain the industry had was in the construction phase and not in subsequent operations. It also pointed out that although data centres employ relatively fewer people compared to other sectors, the jobs are relatively well-paid. [14]

The proposed Mamre Road campus had an estimated 500 construction and operational jobs, according to Australian Computer Society Publication Information Age closer to home. These are estimates of jobs within the project and the publicly reported numbers do not provide an indication of the number of Penrith jobs that would be created directly or through contracting or by Penrith residents. [15]

When operational, a data centre requires people to maintain the electrical and cooling systems, computer equipment, networks and security. Cleaning, maintenance and other services may also be provided by outside contractors.

That distinction matters. 50 people working in a facility doesn’t always mean 50 jobs in the direct employ of the operator, or 50 jobs for the local community. For people living around Penrith or the Hawkesbury, the relevant questions are what will
be done with the jobs once the construction phase is over and what services will be outsourced to other firms, as well as whether there will be a realistic chance for local workers and businesses to thrive.

Are those jobs local?

Data Centre
Building a data centre creates opportunities for construction workers and specialist contractors, although fewer employees may be needed once the facility is operating.

A data centre could create jobs in Western Sydney without necessarily employing people who live in the surrounding suburbs. The construction industry is supported by construction companies, electricians, engineers, equipment providers and specialist maintenance contractors for large developments. Some of these workplaces may be based nearby, while others operate across Sydney or nationally. So, while a major project can bring considerable investment into an area, that doesn’t mean all the money stays in the local economy.

It is helpful to look at an example of CDC Data Centres. The company has a significant development at Marsden Park and states that they have a preference to use local workers and suppliers/contractors where appropriate. It has also noted collaborating with industry that includes engineering, electrical services, manufacturing, plumbing and other specific trades. But this doesn’t provide any indication of the share of businesses or workers located in Western Sydney. [16][17]

A different point of view comes from Virginia, USA. The state’s Joint Legislative Audit and Review Commission reviewed the economic impact of data centres and determined that building of the data centres may contribute to companies that provide materials and services to Virginia. But state-wide benefits do not necessarily reflect what benefits would accrue to individuals living in the immediate vicinity of the development.[14]

While the data centre is operating, people are still required to maintain its electrical and cooling systems, manage IT equipment and provide security, cleaning and other services. Some of these jobs might be done by company that are outsourcing to several worksites, not necessarily the local company. For the proposed Mamre Road campus, the available employment estimates do not establish how many workers would live nearby, how many contracts would go to local businesses or how many permanent positions would involve outsourced services such as cleaning and security.

That distinction matters. Another Sydney maintenance firm might find a job, and have their own staff turn up at the worksite. A local electrician, cleaning or security company could also find some of the work. Both schemes generate income, however, not the same benefits for the immediate community.

So, for Penrith residents the key questions are: How many jobs will be left behind once the construction is done, will the jobs be available to local people and will there be a level playing field for smaller businesses bidding for work in Penrith?

Without those details, it is difficult to judge how much of the employment benefit would reach local workers and businesses.

What would it sound like?

One of the most practical issues is noise for those who lives nearby. Would a data centre sound like a truck permanently driving past?

Not quite. A passing truck makes a relatively brief burst of noise. A data centre, on the other hand, can produce a steady mechanical noise from equipment operating throughout the day and night.

Researchers from UNSW and RMIT found that data-centre noise usually involving low-frequency sound. Cooling equipment, including chillers, air-handling units, cooling towers and pumps, can run continuously. Backup diesel generators can also produce additional noise during testing or power outages. [8]

A data centre is being proposed at Seven Hills in Western Sydney for comparison. An acoustic assessment for the SYD08 development predicted a night-time noise level of 33 dBA at one residential assessment point in Toongabbie during normal operation. When the assessment modelled all backup generators operating during an emergency, the predicted level at the same location increased to 46 dBA. [18]

These were predicted levels, not measurements taken after construction. They also apply to a particular assessment location, rather than every house near the development.

To put the numbers into perspective, 33 dBA is relatively quiet, although a continuous hum sound may still be noticeable in an otherwise quiet neighbourhood. A level of 46 dBA could be more noticeable, particularly at night, depending on the surrounding background noise. Neither figure means a resident would hear a truck constantly passing their house.

The Seven Hills assessment identified a night-time project noise criterion of 36 dBA at that residential location. Its predicted normal operating level was below that criterion, assuming the proposed noise-control measures were implemented. [18]

Distance, building design and the location of cooling equipment can make a considerable difference. Acoustic barriers, equipment enclosures, silencers and other measures can reduce noise before it reaches neighbouring properties.

In addition, there is a health question. While the direct evidence on the specific health impacts of data centre noise is still limited, UNSW researchers point out that there is still a gap in our understanding. More general research on environmental noise also suggests the risk of chronic exposure, but this is not necessarily applicable to all the data centres. [8]

For someone living a block away, the most useful information would be the predicted noise level at their home during normal operation, scheduled generator testing and an emergency power failure.

The Seven Hills figures cannot tell us what residents would hear near the proposed Mamre Road campus. That requires an acoustic assessment of the Mamre Road development itself.

For residents, a promise that a facility will be quiet is one thing. Knowing the expected noise level at the nearest homes, and how it will be controlled, is far more useful.

What happens when several data centres are built together?

A single data centre can bring its own challenges. When several large facilities are proposed in the same area, their combined impact becomes an important consideration.

The Mamre Road Precinct is already undergoing major industrial development. According to the NSW Government, it includes approximately 850 hectares of industrial land and could accommodate around 5,200 construction jobs and 17,000 ongoing jobs when fully developed. These figures apply to the entire industrial precinct, not just data centres. [9]

Other major data-centre developments are also proposed in the wider Penrith area. One example is the STACK SYD01 Data Centre at Erskine Park, which has a proposed operational capacity of 450 megawatts (MW). The project remains subject to the planning assessment process. [10]

That 450 MW figure describes the proposed facility’s capacity, not proof that it would consume that amount of electricity every hour.

The concern is what happens when several large facilities need electricity, water, transport access and other infrastructure in the same part of Western Sydney. For electricity, the important question is whether the network can accommodate the combined demand, what upgrades might be required and who would pay for them. A single project may have a workable connection plan, but that does not automatically answer what happens when several developments are considered together. Water raises a similar question. Different cooling systems have different requirements, so it would be misleading to assume every data centre uses the same amount. However, several facilities drawing on the same water infrastructure could make long- term supply planning more important, particularly during drought.

Then there is the impact on everyday life. Construction vehicles from multiple projects could add to traffic on roads already serving warehouses, freight operators and other industrial businesses. Cooling equipment and generator testing at neighbouring facilities could also contribute to the overall noise environment. These concerns are not purely hypothetical. Public submissions on the proposed STACK SYD01 development have raised questions about electricity and water demand, noise, air emissions and proximity to residential areas. These are concerns expressed by submitters, rather than proof that the predicted impacts will occur. [10]

There are potential benefits from concentrating data centres in an established industrial area. Access to electricity infrastructure, telecommunications networks, major roads and specialist contractors may make such locations more practical than building facilities in isolated areas. But concentrating development also means that environmental and infrastructure impacts need to be assessed together, not simply one application at a time. Infrastructure Australia has estimated that the wider Mamre Road Precinct could generate approximately 99,000 vehicle trips a day once fully developed. That figure covers the entire industrial precinct, not data centres alone, but it shows why road capacity and transport planning matter as development expands. [19]

For people living nearby, the question is not only whether an individual data centre meets its planning requirements. It is whether the area’s roads, electricity network, water infrastructure and surrounding communities can cope with the combined development over time.

After all, residents don’t experience planning applications one at a time. They experience what is built around them.

What has happened overseas?

Australia isn’t the first country to face questions about where data centres should be built, how much electricity they need and whether the benefits outweigh the costs for nearby communities. Ireland is one example of how quickly demand can grow. According to Ireland’s Central Statistics Office, data centres accounted for 23% of the country’s metered electricity consumption in 2025, compared with just 5% in 2015. Their annual consumption reached 7,663 gigawatt-hours (GWh), an increase of 10% from the previous year. [2]

Those figures don’t mean data centres are solely responsible for Ireland’s electricity challenges. They do, however, show why governments need to consider the combined demand from multiple facilities rather than assessing each development in isolation.

The United States provides a different perspective. Northern Virginia has become one of the world’s largest data-centre markets, helped by its telecommunications infrastructure, electricity supply, available land and proximity to major customers. A 2024 investigation by Virginia’s Joint Legislative Audit and Review Commission found that the industry brought substantial economic benefits to the state, particularly through construction spending. However, it also found that data centres generally employed relatively few permanent workers compared with other industries. [14]

The report raised questions about future electricity infrastructure requirements and the costs associated with meeting growing demand. These are not simply environmental concerns. They also affect decisions about electricity networks and how infrastructure costs are shared.

There have also been disputes over where new facilities should be built. In Prince William County, Virginia, a proposal known as the Digital Gateway would have allowed up to 37 data centres near Manassas National Battlefield Park. Residents and conservation groups opposed the development, raising concerns about land use, the surrounding environment and the planning process. The project had originally been approved in 2023. However, the rezoning approvals were overturned following legal challenges involving public notification requirements.

By July 2026, the developers had withdrawn their remaining legal challenges, leaving the proposed development unable to proceed under those approvals. [20]

The important distinction is that the court decision concerned the legality of the planning process. It was not a finding that all data centres are environmentally unacceptable.

Opposition has not been limited to Virginia. In Japan, residents near Goodman’s proposed data-centre campus in Tsukuba have questioned the scale of the development and how the project was communicated to the surrounding community. Reuters reported in October 2026 that a residents’ group had gathered approximately 800 signatures seeking a public meeting. [21]

These examples show that community concerns can involve more than electricity and water. People also want to understand what is being built near their homes, how it may change their neighbourhood and whether they have a meaningful opportunity to raise concerns.

At the same time, some operators are responding to those concerns. In October 2026, Amazon announced plans to invest US$1 billion over five years in American communities hosting its data centres, including funding for education, job training, energy affordability and resource conservation. [22]

That announcement is a commitment rather than evidence that all the promised benefits have already been delivered. Still, it suggests that operators increasingly recognise the need to demonstrate benefits beyond constructing a large facility.

So, what does this mean for Penrith or the Hawkesbury?

The overseas experience doesn’t provide a simple answer for or against data centres. Virginia shows the economic value of construction alongside the relatively small permanent workforce. Ireland shows what rapid growth can mean for electricity demand. Prince William County and Tsukuba show how community opposition can become significant when residents question planning decisions or communication. For Western Sydney, the lesson is to ask detailed questions early: how much electricity and water will a development need, what infrastructure upgrades will be required, how
many local jobs will remain after construction and how will nearby residents be affected?

Those questions are easier to address before a project is built than after the surrounding community must live with it.

Australia is having the same argument

The debate about data centres is no longer something happening only overseas. It is already playing out in Sydney.

In September 2026, property developer Goodman Group withdrew its proposal for a $1.2 billion, 90-megawatt data centre at Lane Cove West. Known as Project Mars, the facility would have been located approximately 20 metres from nearby homes. [12]

Residents had raised concerns about noise, electricity and water consumption, environmental impacts and the suitability of such a large industrial facility so close to housing.

Goodman said its decision reflected changes in the policy and regulatory environment, as well as feedback received during the planning process. The company had also acknowledged during a Senate inquiry that it had not secured sufficient community support for the proposal. [12]

Local reporting gives a clearer picture of what residents were concerned about. A community meeting in September attracted substantial interest, with residents questioning the scale of the proposed development and whether they had been properly consulted. [23]

The Lane Cove case is important because the project was not simply rejected after a technical assessment found it unsafe. The developer withdrew its application after considering regulatory changes and community feedback.

It also shows that community acceptance can become a major issue for developers, even when a project represents a substantial financial investment. There is another side to the argument. Data centres support services that households and businesses increasingly rely on, from banking and telecommunications to cloud computing and artificial intelligence. Australia needs digital infrastructure, and developments in established industrial areas may be more practical than facilities built close to residential streets.

But being in an industrial precinct does not remove the need to consider nearby homes, electricity connections, water supply, traffic and noise.

For Penrith, the lesson from Lane Cove is not that every proposed data centre should be opposed. It is that residents need clear information about what is proposed, how it will affect their neighbourhood and what benefits they can reasonably expect. If developers can explain those details early, backed by credible assessments rather than broad promises, communities will be in a better position to judge whether a project is suitable.

After all, the question for Joe Average is not whether Australia needs data centres. It is whether a particular data centre is being built in the right place, with the right safeguards and a fair deal for the people living nearby.

What about the local economy?

A billion-dollar data centre sounds like a major boost for the local economy. But how much of that investment would benefit people and businesses in Penrith?

During construction, there are opportunities for builders, electricians, civil contractors, transport operators and equipment suppliers. Nearby cafes, shops and accommodation providers might also benefit from workers spending money in the area.

However, the total value of a development should not be confused with the amount spent locally. Expensive equipment such as servers, cooling systems and electrical components may come from suppliers elsewhere in Australia or overseas.

Research from Virginia in the United States provides a useful comparison. The state’s Joint Legislative Audit and Review Commission found that data centres generated substantial economic activity, particularly through construction. However, the facilities generally required relatively few permanent workers compared with the scale of their investment. [14]

For Western Sydney, there could be longer-term opportunities for electrical contractors, maintenance businesses, security providers and specialist IT services. Whether those opportunities go to local businesses depends on how operators select their suppliers and contractors.

The proposed Mamre Road campus is expected to involve substantial investment, but I could not establish a verified public breakdown showing how much of that spending would go to Penrith businesses, how many contracts would be awarded locally or what additional revenue the development might generate for the local council.

Without those figures, it would be misleading to claim that a particular amount of money will flow directly into the surrounding community.

There are costs to consider as well. Data centres need reliable electricity connections, water infrastructure, road access and telecommunications networks. Developers may pay for some upgrades, while other infrastructure can involve network operators or public investment. The arrangements need to be examined for each project rather than assuming local ratepayers will either pay for everything or pay nothing.

Land use is another consideration. The Mamre Road Precinct is intended to accommodate a range of industrial businesses, including warehousing, logistics and other employment-generating activities. A large data centre occupies land that might otherwise support a different type of development. [9]

That doesn’t automatically make one use better than another. But it does mean the economic benefits should be considered alongside the opportunities that could be lost. For a local electrician, the benefit might be an ongoing maintenance contract. For someone looking for work, it could be a permanent technical position. For a nearby business, it might be additional customers during construction.

These are practical benefits, but they should not be presented as guaranteed outcomes.

The economic case for a data centre should therefore consider more than the headline investment. Local employment, contracts awarded to nearby businesses, infrastructure costs and long-term land use all matter.

A large data centre may contribute significantly to Western Sydney’s economy. What remains less clear is how much of that contribution would reach the people living and working closest to it.

The environmental side

Data centres support services we use every day, but the buildings themselves have an environmental footprint. The main concerns are electricity consumption, water use, backup generators, construction and the land occupied by the facilities.

Electricity is probably the biggest issue. Servers and networking equipment need power around the clock, while cooling systems use additional energy to prevent overheating.

How much a facility consumes depends on its size, equipment, workload and efficiency.

For a development as large as the proposed Mamre Road Data Centre Campus, the important distinction is between maximum capacity and actual electricity consumption. A proposed capacity of 1 gigawatt does not mean the facility will draw that amount continuously. However, even operating below maximum capacity, a large campus could place considerable demand on the electricity network. [1]

There is also the question of where that electricity comes from. Renewable electricity purchasing arrangements may help operators reduce their reported emissions, but they do not necessarily mean the facility is powered entirely by renewable generation at every hour of the day.

Water is another concern, particularly in a region familiar with hot summers and periods of drought. Some cooling systems consume water through evaporation, while others rely more heavily on air cooling and electricity. This creates a trade-off: a system that uses less water may require more energy, depending on its design and operating conditions.

An ABC News report on the proposed Western Downs data-centre development in Queensland described projected water requirements of approximately 522 kilolitres per day during construction and 16.5 kilolitres per day during operation. Those figures were developer estimates for that proposal, not measurements of actual consumption or forecasts for Mamre Road. [5]

For Western Sydney, the questions are how much water a proposed facility would need during normal operation and extreme heat, whether recycled water could be used and how the development would affect existing supply arrangements.

Backup generators introduce another environmental issue. The Mamre Road proposal includes hundreds of diesel generators intended to maintain power if the main electricity supply fails. These would not normally run continuously but testing and emergency operation could produce noise and exhaust emissions. The environmental assessment needs to consider how often they may operate, how emissions would be managed and what nearby residents could experience. [1]

Construction also has an impact. Preparing a large site, transporting materials and installing equipment can generate dust, traffic, noise and construction-related emissions. Once built, the facility occupies land that could otherwise support another use.

None of these issues means data centres should automatically be ruled out. Better cooling technology, careful site selection, efficient equipment, water management and appropriate noise controls can reduce their environmental impact.

But the benefits of those measures need to be demonstrated, not simply promised. The Australian Government’s 2026 consultation on AI infrastructure recognised the need to consider energy, water, environmental sustainability and community impacts as demand for data-centre capacity grows. [3]

For Penrith and the Hawkesbury, the key question is whether a proposed facility can operate without placing unreasonable pressure on local infrastructure and the surrounding environment.

That requires project-specific evidence: expected electricity consumption, cooling and water requirements, generator emissions, construction impacts and the measures proposed to manage them.

A data centre may be essential digital infrastructure, but that does not make its environmental footprint disappear. The sensible approach is to understand that footprint before deciding whether the development is suitable for a particular location.

The technical side

A data centre might look like a large warehouse from the outside, but keeping one running is a very different challenge. Inside, thousands of servers and networking devices may be operating around the clock. They need reliable electricity, cooling, internet connectivity and systems that can
respond quickly when something goes wrong.

Electricity reliability is particularly important. Large data centres generally use uninterruptible power supplies (UPS), backup generators and multiple electrical systems to reduce the risk of an outage. A UPS can provide immediate short-term power if the main supply fails, while backup generators
are intended to support operations during longer interruptions.

However, having backup equipment does not make a facility completely immune to failure. Equipment can malfunction, maintenance can introduce risks and different systems may depend on one another.

There is also the question of how a very large data centre interacts with the electricity grid. CSIRO and Monash University have examined the technical challenges associated with large electricity-consuming facilities, including how their equipment responds to disturbances in the power network. [13
]
One issue is known as fault ride-through. In simple terms, this means a facility needs to respond appropriately when there is a brief voltage disturbance on the grid, rather than unexpectedly disconnecting large amounts of electrical load.

Why does that matter?

If a major electricity consumer suddenly disconnects, it can affect the balance between electricity supply and demand. When several large facilities are connected to the same network, their behaviour during a disturbance becomes an important consideration for network operators.

That does not mean data centres will automatically destabilise the electricity grid. It means their connections and protection systems need to be designed and assessed carefully.

Cooling is another technical challenge.

Servers produce heat while operating, and that heat needs to be removed continuously. Cooling systems must be designed for the equipment installed, the expected workloads and local weather conditions. Western Sydney’s hot summer days make cooling performance particularly relevant. A
system that works efficiently during mild weather still needs to cope when outdoor temperatures rise.

Internet connectivity matters too. Data centres depend on high-capacity fibre networks, and operators may use multiple connections to reduce the risk of a single network failure interrupting service. Security is another part of the picture. Physical access controls, monitoring, fire detection and suppression systems, and cybersecurity measures all help protect equipment and the information or services it supports.

For Penrith, the technical questions go beyond whether a proposed data centre can operate successfully on its own. Can the electricity network support the proposed demand? How will the facility respond to grid disturbances? What happens if cooling equipment fails during a heatwave? And are the backup systems designed to work safely under those conditions?

These are matters for engineers, network operators and regulators, but their consequences can extend beyond the site. A well-designed data centre should be able to demonstrate how it will manage these risks before it begins operating. For the surrounding community, that is more reassuring
than simply being told the technology is reliable.

What would Joe Average notice?

For most people, the inside of a data centre is not particularly interesting. What matters is whether having one nearby changes their everyday life. If a facility is built in an established industrial area, many residents might barely notice it once construction is finished. There may be no customers coming and going, and the building could look much like another large warehouse.

Construction would probably be more noticeable. Heavy vehicles, building work, temporary road disruptions and noise can affect surrounding businesses and residents, particularly when several developments are happening at the same time. Once a data centre is operating, the experience could be quite different. Someone living close to the facility might notice the sound of cooling equipment, particularly at night when the surrounding area is quieter. Backup-generator testing could also create occasional periods of louder noise. How noticeable either would be depends on the site’s design, distance from homes and noise-control measures.

Electricity and water are less visible but potentially more significant. Residents would not necessarily see a data centre using electricity, but a large development may require substantial network infrastructure. Whether that leads to additional costs for other electricity customers depends on how the connection and upgrades are funded. It would be misleading to assume that household power bills will automatically increase because a data centre is built nearby.

The same applies to water. A facility’s impact depends on its cooling technology, actual consumption and water supply arrangements. Those details matter more than a general claim that all data centres use enormous amounts of water.

There could also be benefits that residents notice. A local electrical business might secure maintenance work. A security company or cleaning contractor could gain a new customer. Construction workers may spend money at nearby cafes and shops. However, none of those outcomes should be treated as guaranteed without information about local hiring and procurement. There is also the question of what residents see around them. A large industrial building, additional electrical infrastructure or changes to nearby roads may alter the appearance and character of an area, even if the facility operates within its approved environmental limits.

For someone living several kilometres away, the effects may be minimal. For a household close to a development or a business affected by construction traffic, they could be more noticeable.

That is why location matters so much. The experience of someone living near an industrial precinct in Erskine Park may be quite different from that of someone living beside a proposed facility in a quieter part of the Hawkesbury.

Joe Average probably isn’t going to judge a data centre by the number of servers inside it. They are more likely to ask whether it creates useful local jobs, affects traffic, makes noise, places pressure on local services or changes the neighbourhood.

Those are reasonable questions, and they deserve answers based on the actual proposal rather than broad promises about the benefits of technology.

So, would Joe Average want one?

The answer probably depends on where it is built, how it operates and what the surrounding community gets out of it.

Data centres are an important part of modern life. They support banking, communications, business systems, cloud services and increasingly artificial intelligence. As demand for these services grows, Australia will need somewhere to house the equipment that keeps them running.

But recognising that need doesn’t mean every proposed location is suitable. A data centre in an established industrial area, away from homes and with adequate electricity, water and road infrastructure, may be easier for a community to accept. A large facility close to residential properties, particularly one requiring significant infrastructure upgrades, is likely to raise more questions.

There are potential economic benefits, especially during construction. Local businesses may also gain maintenance and service contracts. However, the overseas evidence shows why permanent employment figures, local recruitment and the distribution of those benefits deserve closer attention.

Electricity demand, water consumption, noise and backup-generator emissions also matter. These aren’t reasons to reject every proposal, but they are reasons to expect detailed assessments and clear explanations from developers.

The experiences in Ireland, Virginia and Sydney show that the argument is not simply about supporting or opposing technology. It is also about infrastructure capacity, planning decisions and whether residents feel their concerns have been properly addressed.

For Penrith, where major industrial development is already underway, the question is how another large facility would fit into the wider area. For the Hawkesbury, where the setting and surrounding land uses may be quite different, the same type of development could raise different concerns.

Before researching this topic, I hadn’t really thought about how much electricity, water and infrastructure a data centre might need. I knew data centres were important, but I hadn’t considered what having one nearby could mean for local residents. What surprised me most was the difference between the number of jobs created during construction and the smaller workforce needed once a facility is running. I also hadn’t realised how much noise, electricity and water use could vary depending on the design of the facility.

I don’t think building data centres is necessarily a bad idea, especially when so many of us rely on digital services every day. But if one were proposed near my home, I’d want to know how it would affect the neighbourhood and whether local people would genuinely benefit.

So, would Josephine or Joe Average want a data centre nearby?

Possibly, if the location makes sense, the impacts are properly managed, and the community can see a worthwhile benefit. But that support shouldn’t be taken for granted. Developers need to show why a particular project belongs in a particular place.

For Western Sydney, the real question isn’t whether data centres have a future. It’s how to make sure their growth works for the people who already call the area home.

References / Bibliography

[1] NSW Planning Portal — Mamre Road Data Centre Campus — project size, 1 GW capacity, cooling equipment, generators, diesel storage and planning status.

[2] Central Statistics Office Ireland — Data Centres Metered Electricity Consumption 2025 — electricity consumption and the 23% share of Ireland’s metered electricity consumption in 2025.

[3] Australian Government — Getting it right: Building AI infrastructure that works for Australia — infrastructure, land, energy, water, telecommunications and community considerations.

[4] CSIRO — Australia-first pilot to transform data centres from static loads into dynamic grid-aware assets — flexible AI workloads and electricity-grid demand.

[5] ABC News — International developer plans Australia’s largest data centre in regional Queensland — water requirements and infrastructure issues.

[6] ABC News — AI data centre advocates accused of overstating employment benefits — construction and ongoing employment.

[7] ABC News — Anthropic is set to run Claude out of a Queensland data centre — proposed jobs, power capacity and operational workforce.

[8] UNSW — Are data centres actually noisy, and is this bad for our health? — data- centre noise, cooling equipment, noise limits and current health evidence.

[9] NSW Planning Portal — Mamre Road Precinct — precinct size and projected employment.

[10] NSW Planning Portal — STACK SYD01 Data Centre, Erskine Park — 450 MW data-centre proposal in Penrith.

[11] CSIRO — GenCost 2025–26 — changing electricity demand and the effect of data-centre growth on energy infrastructure.

[12] Reuters — Australian developer axes Sydney suburban data-centre plan after local opposition — Lane Cove’s 90 MW proposal and local concerns.

[13] CSIRO/Monash University — Fault ride-through requirements of utility-scale data centres — technical challenges associated with connecting large data-centre loads to electricity grids.

[14] Virginia Joint Legislative Audit and Review Commission — Data Centers in Virginia (2024). Independent state legislative research into employment, contractors and economic impacts.

[15] Australian Computer Society (ACS) — Concern over Australia’s most power-hungry data centre (2026)

[16] CDC Data Centres — Marsden Park

[17] CDC Data Centres — Building an Ecosystem of Opportunity

[18] Pulse White Noise Acoustics — SYD08 Acoustic Assessment, Seven Hills

[19] Infrastructure Australia — Mamre Road Upgrade Stage 2. Provides the estimate of 99,000 daily vehicle trips across the fully developed precinct.

[20] Prince William County Government — PW Digital Gateway, planning and court updates (2026).

[21] Reuters — Goodman’s Japanese data centre comes under fire following Sydney site setback (7 October 2026).

[22] Reuters — Amazon to invest $1 billion over five years in US data center communities (2 October 2026).

[23] In the Cove — Lane Cove West Data Centre Community Meeting